Cost EstimatesLaajuus (3 cr)
Code: BYV22EK02
Credits
3 op
Objective
The student:
Can systematically generate quantities and costs for a construction project
Can use BIM for quantity surveying and cost calculation
Content
Format for quantities
Work hours and waste
Cost of materials and salaries
Indices
Regional cost levels
Profit
Qualifications
Project Management 1-2
Assessment criteria, satisfactory (1)
Costing
Know the basics of costing
Quantity surveying
Knows how to produce materials and workloads according to Ratu's directives
Assessment criteria, good (3)
Costing
has an overall picture of when, where and how costs are incurred in a building project and understands the reason for this
Quantity surveying
Understands how to produce materials and workloads according to Ratu directives
Assessment criteria, excellent (5)
Costing
Ability to independently calculate costs for a construction project
Quantity surveying
Can independently produce material and workload according to Ratu's directives
Enrollment
01.12.2024 - 13.01.2025
Timing
06.01.2025 - 06.04.2025
Number of ECTS credits allocated
3 op
Mode of delivery
Contact teaching
Unit
Faculty of Technology and Seafaring
Campus
Vasa, Wolffskavägen 33
Teaching languages
- Svenska
Degree programmes
- Degree Programme in Civil and Construction Engineering
Teachers
- Kenneth Julin
Teacher in charge
Leif Östman
Scheduling groups
- BYS22-K (Size: 40. Open UAS: 0.)
- BYS21-K (Size: 40. Open UAS: 0.)
- BYS22-P (Size: 40. Open UAS: 0.)
- BYS21-P (Size: 40. Open UAS: 0.)
Groups
-
BYS21D-VIngenjör (YH), byggnads- och samhällsteknik, 2021 Vasa, dagstudier
-
BYS22D-VIngenjör (YH), byggnads- och samhällsteknik, 2022 Vasa, dagstudier
Small groups
- BYS22-K
- BYS21-K
- BYS22-P
- BYS21-P
Objective
The student:
Can systematically generate quantities and costs for a construction project
Can use BIM for quantity surveying and cost calculation
Content
Format for quantities
Work hours and waste
Cost of materials and salaries
Indices
Regional cost levels
Profit
Evaluation scale
H-5
Assessment criteria, satisfactory (1)
Costing
Know the basics of costing
Quantity surveying
Knows how to produce materials and workloads according to Ratu's directives
Assessment criteria, good (3)
Costing
has an overall picture of when, where and how costs are incurred in a building project and understands the reason for this
Quantity surveying
Understands how to produce materials and workloads according to Ratu directives
Assessment criteria, excellent (5)
Costing
Ability to independently calculate costs for a construction project
Quantity surveying
Can independently produce material and workload according to Ratu's directives
Qualifications
Project Management 1-2