Cost EstimatesLaajuus (3 cr)

Code: BYV22EK02

Credits

3 op

Objective

The student:
Can systematically generate quantities and costs for a construction project
Can use BIM for quantity surveying and cost calculation

Content

Format for quantities
Work hours and waste
Cost of materials and salaries
Indices
Regional cost levels
Profit

Qualifications

Project Management 1-2

Assessment criteria, satisfactory (1)

Costing
Know the basics of costing

Quantity surveying
Knows how to produce materials and workloads according to Ratu's directives

Assessment criteria, good (3)

Costing
has an overall picture of when, where and how costs are incurred in a building project and understands the reason for this

Quantity surveying
Understands how to produce materials and workloads according to Ratu directives

Assessment criteria, excellent (5)

Costing


Ability to independently calculate costs for a construction project

Quantity surveying

Can independently produce material and workload according to Ratu's directives

Enrollment

01.12.2024 - 13.01.2025

Timing

06.01.2025 - 06.04.2025

Number of ECTS credits allocated

3 op

Mode of delivery

Contact teaching

Unit

Faculty of Technology and Seafaring

Campus

Vasa, Wolffskavägen 33

Teaching languages
  • Svenska
Degree programmes
  • Degree Programme in Civil and Construction Engineering
Teachers
  • Kenneth Julin
Teacher in charge

Leif Östman

Scheduling groups
  • BYS22-K (Size: 40. Open UAS: 0.)
  • BYS21-K (Size: 40. Open UAS: 0.)
  • BYS22-P (Size: 40. Open UAS: 0.)
  • BYS21-P (Size: 40. Open UAS: 0.)
Groups
  • BYS21D-V
    Ingenjör (YH), byggnads- och samhällsteknik, 2021 Vasa, dagstudier
  • BYS22D-V
    Ingenjör (YH), byggnads- och samhällsteknik, 2022 Vasa, dagstudier
Small groups
  • BYS22-K
  • BYS21-K
  • BYS22-P
  • BYS21-P

Objective

The student:
Can systematically generate quantities and costs for a construction project
Can use BIM for quantity surveying and cost calculation

Content

Format for quantities
Work hours and waste
Cost of materials and salaries
Indices
Regional cost levels
Profit

Evaluation scale

H-5

Assessment criteria, satisfactory (1)

Costing
Know the basics of costing

Quantity surveying
Knows how to produce materials and workloads according to Ratu's directives

Assessment criteria, good (3)

Costing
has an overall picture of when, where and how costs are incurred in a building project and understands the reason for this

Quantity surveying
Understands how to produce materials and workloads according to Ratu directives

Assessment criteria, excellent (5)

Costing


Ability to independently calculate costs for a construction project

Quantity surveying

Can independently produce material and workload according to Ratu's directives

Qualifications

Project Management 1-2